As A Project Manager, Preparing Two Project Outlines

As A Project Manager You Are Going To Prepare Two Project Outlines Fo

As a project manager, you are going to prepare two project outlines for the development of a mobile application. One project outline uses a waterfall model, another uses an agile method. Prepare two project outlines using Microsoft® Project. Each outline shall consist of a task list and a Gantt chart showing task durations and precedence relationships. Include a 350- to 700-word brief explanation of how the two project outlines differ. Be sure to address how Agile addresses complexity and uncertainty.

Paper For Above instruction

Introduction

The development of a mobile application requires careful planning and execution, often aligned with specific project management methodologies. Two predominant approaches are the traditional Waterfall model and the Agile methodology. Constructing project outlines using these approaches involves distinct tasks, timelines, and planning processes. This paper elaborates on the creation of two project outlines—one employing the Waterfall model and the other utilizing Agile methods—and discusses how each handles project complexity and uncertainty.

Creating the Waterfall Project Outline

The Waterfall model follows a linear and sequential process, beginning with comprehensive planning, followed by design, development, testing, and deployment. In Microsoft Project, this outline starts with defining broad project phases, each consisting of specific, sequential tasks:

  • Project Initiation
  • Requirement Analysis
  • System Design
  • Implementation (Development)
  • Testing
  • Deployment
  • Maintenance and Support

Each task is assigned a duration based on project estimations, with dependencies establishing a logical flow—e.g., testing cannot commence until implementation is complete. The Gantt chart visually depicts these tasks along a timeline, displaying dependencies and critical paths.

The task list in the Waterfall outline emphasizes detailed documentation before development begins, fostering a structured approach that minimizes ambiguity. The entire project timeline enhances clarity but offers limited flexibility once execution begins.

Creating the Agile Project Outline

In contrast, the Agile project outline adopts an iterative process emphasizing flexibility, stakeholder collaboration, and incremental development. Tasks are organized into sprints—short, time-boxed iterations, typically lasting 2-4 weeks:

  • Sprint Planning
  • Design and Development per Sprint
  • Daily Stand-ups
  • Sprint Review and Retrospective

Each sprint produces a usable segment of the mobile application, allowing for continuous feedback and adjustments. The Gantt chart for Agile is more dynamic, emphasizing overlapping tasks and flexible dependencies, with clear iteration cycles.

In Microsoft Project, this outline includes multiple sprints, each with containing tasks for design, coding, integration, testing, and review. Agile’s iterative nature helps teams adapt to changing requirements, handle unforeseen challenges, and incorporate stakeholder input continuously.

Differences in Approach, Handling Complexity, and Uncertainty

The primary difference between these approaches lies in their handling of complexity and uncertainty:

  • Waterfall Model: Suitable for projects with well-defined requirements and minimal expected change. Its linear structure means that any uncertainty detected late can be costly to address, and unforeseen complexity often necessitates rework or project adjustments. The model's rigidity minimizes flexibility but offers predictability and clear documentation.
  • Agile Methodology: Designed to address complexity and uncertainty through iterative cycles and adaptive planning. Agile encourages embracing change, facilitating ongoing stakeholder engagement to refine requirements based on evolving project insights. This approach minimizes risks associated with uncertainty by allowing incremental delivery and real-time response to issues. Agile's flexibility enhances its capacity to manage complex, unpredictable projects effectively.

Furthermore, Agile promotes early detection of issues, continuous integration, and frequent testing, which are crucial when dealing with complex systems where requirements may evolve or be ambiguous initially.

Conclusion

In conclusion, creating project outlines using Microsoft Project for both Waterfall and Agile approaches involves detailed task listing, timeline planning, and dependency mapping. While the Waterfall model offers a structured, linear path ideal for straightforward projects, Agile provides a flexible, iterative framework better suited for complex, uncertain projects. Understanding these differences allows project managers to select the methodology best aligned with project requirements, stakeholder expectations, and the inherent complexity of mobile application development.

References

  • Boehm, B. (1988). A Spiral Model of Software Development and Enhancement. Computer, 21(5), 61-72.
  • Highsmith, J. (2002). Agile Software Development Ecosystems. Addison-Wesley.
  • Schwaber, K., & Beedle, M. (2002). Agile Software Development with Scrum. Prentice Hall.
  • Pressman, R. S. (2014). Software Engineering: A Practitioner's Approach. McGraw-Hill Education.
  • Kniberg, H., & Skarin, M. (2010). Kanban and Scrum - making the most of both. C4Media.
  • Ries, E. (2011). The Lean Startup. Crown Business.
  • Schwaber, K., & Sutherland, J. (2020). The Scrum Guide. Scrum.org.
  • Agile Alliance. (2021). The Agile Manifesto. https://www.agilealliance.org
  • Project Management Institute. (2017). A Guide to the Project Management Body of Knowledge (PMBOK® Guide). PMI.
  • Sutherland, J. & Schwaber, K. (2017). The Scrum Guide. Scrum.org.