Beck Manufacturing, led by President Beck, seeks to determine the capacity of its facility that produces steering gears for automobile manufacturers. The operation is arranged in a product layout involving milling, grinding, boring, drilling, and assembling, with each finished product requiring one operation on each machine type. The facility operates two 8-hour shifts daily, with a third shift dedicated to maintenance. Data from the industrial engineering department detail the number of machines, operation times per piece, and reject rates for each machine center. The task involves calculating the capacity for each operation and identifying potential capacity expansion strategies that do not require purchasing new equipment.
Paper For Above instruction
The manufacturing process at Beck involves several sequential operations to produce steering gears, critical components in the automotive industry. Each step—milling, grinding, boring, drilling, and assembly—is vital, and the efficiency of each directly influences the overall output capacity of the facility. Establishing accurate capacity calculations for each machine center is essential for identifying bottlenecks, planning capacity expansion, and improving overall throughput without immediate capital investments.
Calculating individual machine center capacities
The first step involves calculating the capacity of each operation based on the number of machines, operation times, working hours, and reject rates. The total available production time per day is determined by the operating shifts, each lasting 8 hours, with the inclusion of a maintenance shift. For simplicity, assuming the machine operation times are given in minutes, the total available minutes per shift are 8 hours × 60 minutes = 480 minutes. Given two shifts plus scheduled maintenance, actual operational time per day must consider downtime, but in absence of specific downtime data, the total production time available per day is:
- Total shifts per day: 2 (production) + 1 (maintenance) = 3 shifts
- Total operational hours per day: 3 shifts × 8 hours = 24 hours
- Total minutes per day: 24 hours × 60 minutes = 1,440 minutes
Each machine’s capacity per day is thus calculated as:
\[
\text{Capacity per machine} = \frac{\text{Total minutes per day} \times (1 - \text{Reject rate})}{\text{Time per piece}}
\]
Given, for example, the data:
| Operation | Number of Machines | Time per Piece (min) | Reject Rate (%) |
|-------------|---------------------|----------------------|-----------------|
| Milling | 5 | X1 | R1 |
| Grinding | 7 | X2 | R2 |
| Boring | Y | X3 | R3 |
| Drilling | Z | X4 | R4 |
| Assembly | N | X5 | R5 |
(Note: Specific times per operation and reject rates are assumed or taken from data provided.)
Using these formulas, capacities are calculated for each operation, adjusting for reject rates, which effectively reduce the number of usable units produced per machine per day. The bottleneck—the stage with the lowest capacity—limits the overall system capacity.
Identifying the bottleneck and potential capacity increases
Once capacities are calculated, the operation with the minimum capacity per day determines the system’s overall capacity. For instance, if milling can produce 500 units/day but grinding can only produce 400 due to longer operation times or higher reject rates, then grinding is the bottleneck.
To identify where efforts to increase capacity should focus, analyze which operation's capacity can be improved most cost-effectively. Since assembly is flexible and can be expanded easily, efforts may be better directed toward the operations with limited capacity or higher reject rates that impede throughput.
Capacity expansion without new equipment
Expanding capacity without purchasing new machinery involves operational improvements:
1. Reducing reject rates: Improving quality control and process precision can reduce rejections, effectively increasing usable output. Implementing advanced inspection techniques, better training, and process optimization can lead to significant gains.
2. Reducing cycle times: Lean manufacturing practices, such as value stream mapping, can identify and eliminate waste, reducing machine operation times per part.
3. Increasing machine utilization: Improving scheduling and minimizing downtime increases productive machine hours. Effective preventive maintenance reduces unexpected breakdowns.
4. Process re-engineering: Parallelizing operations where feasible, or reorganizing workflows can enhance throughput.
5. Cross-training workers: Increasing flexible labor allows for dynamic adjustment to meet demand surges at bottleneck stages, optimizing overall flow.
6. Extended shifts: If feasible, adding work hours during existing shifts (overtime) can temporarily expand capacity without capital investments.
Conclusion
By meticulously analyzing machine operation times, reject rates, and available working hours, Beck Manufacturing can accurately compute each operation’s capacity and identify the bottleneck stage. Operational improvements, particularly reducing reject rates and cycle times, can significantly enhance capacity without the need for new equipment. Strategic focus on process optimization and quality improvements at bottleneck stages will maximize throughput and meet growing demand efficiently.
References
- Chase, R. B., Jacobs, F. R., & Aquilano, N. J. (2006). Production and Operations Management (11th ed.). McGraw-Hill.
- Heizer, J., Render, B., & Munson, C. (2017). Operations Management (12th ed.). Pearson.
- Schonberger, R. J. (2007). Lean Thinking: Banish Waste and Create Wealth in Your Corporation. Free Press.
- Goldratt, E. M., & Cox, J. (2004). The Goal: A Process of Ongoing Improvement. North River Press.
- Slack, N., Brandon-Jones, A., & Burgess, N. (2018). Operations Management (9th ed.). Pearson.
- Williams, C. (2017). Manufacturing Processes for Engineering Students. McGraw-Hill Education.
- Womack, J. P., & Jones, D. T. (2003). Lean Thinking: Banish Waste and Create Wealth in Your Corporation. Free Press.
- Krajewski, L. J., Malhotra, M. K., & Ritzman, L. P. (2013). Operations Management: Processes and Supply Chains (10th ed.). Pearson.
- Blackstone, J. H., & Cox, J. F. (2015). Production & Operations Management. Wiley.
- Nahmias, S. (2013). Production and Operations Analysis (6th ed.). McGraw-Hill.