Determine the capacity of this process

Print View Problem 5-14 The following diagram shows a 4-step process that begins with Operation 1 and ends with Operation 4. The rates shown in each box represent the effective capacity of that operation. The objective is to determine the overall capacity of the process, which is constrained by the bottleneck operation with the lowest capacity.

To assess overall capacity, first identify the effective capacity of each step in the process. These capacities indicate how many units can be processed per hour or day at each stage, considering current efficiencies. The capacity of the entire process is limited by the slowest step, often called the bottleneck. Once identified, the process's maximum throughput is equal to the capacity of this bottleneck.

Suppose the capacities of the four operations are as follows: Operation 1: 100 units/hour, Operation 2: 80 units/hour, Operation 3: 90 units/hour, and Operation 4: 110 units/hour. The bottleneck is Operation 2 with 80 units/hour. Therefore, the process's capacity is 80 units/hour.

Understanding capacity is vital for effective process management, as it influences production scheduling, resource allocation, and customer service levels. Effectively measuring capacity involves analyzing actual performance versus designed capacity and pinpointing constraints that limit throughput.

Sample Paper For Above instruction

Assessing the capacity of a manufacturing or service process involves understanding the rate at which each stage can operate and identifying constraints that limit overall output. In the context of a four-step process, each step's effective capacity determines the maximum throughput of the entire system. The key is to recognize that the process's overall capacity cannot exceed the capacity of its slowest component, commonly known as the bottleneck.

Effectively measuring capacity begins with collecting data on current operation rates. This includes analyzing cycle times, machine efficiencies, and downtime to estimate the actual capacity versus the designed capacity. Once this information is available, each process step's capacity can be calculated. If the capacities are represented as units per hour or per day, the step with the lowest capacity sets the ceiling for total output.

For example, consider a four-step process with capacities of 100, 80, 90, and 110 units per hour, respectively. Here, the bottleneck is the second step with 80 units per hour. Therefore, the process overall cannot produce more than 80 units per hour under current conditions. This insight allows managers to focus improvement efforts on the bottleneck to increase overall throughput, such as investing in faster equipment, reducing downtime, or increasing staffing at that stage.

Measuring capacity also involves evaluating the effective capacity, which accounts for factors like maintenance, shift changes, and variability in process execution. By understanding both design capacity and effective capacity, organizations can identify gaps and develop strategies to enhance performance through capacity planning and process improvement initiatives.

In conclusion, determining process capacity requires comprehensive analysis of each process stage, identification of bottlenecks, and ongoing measurement and adjustment. This approach enables organizations to optimize throughput, meet customer demands effectively, and improve overall operational efficiency.

References

  • Heizer, J., Render, B., & Munson, C. (2020). Operations Management (13th ed.). Pearson.
  • Chary, S. N. (2017). Production and Operations Management. McGraw-Hill Education.
  • Krajewski, L. J., Ritzman, L. P., & Malhotra, M. (2019). Operations Management: Processes and Supply Chains. Pearson.
  • Slack, N., Brandon-Jones, A., & Burgess, N. (2019). Operations Management (9th ed.). Pearson.
  • Meredith, J. R., & Shafer, S. M. (2019). operations management for MBAs. Wiley.
  • Roth, A., & Muñoz, M. (2017). Capacity planning and control. Journal of Manufacturing Systems, 45, 68-77.
  • Chopra, S., & Meindl, P. (2018). Supply Chain Management: Strategy, Planning, and Operation. Pearson.
  • Stevenson, W. J. (2018). Operations Management (13th ed.). McGraw-Hill Education.
  • Fitzsimmons, J. A., & Fitzsimmons, M. J. (2018). Service Management: Operations, Strategy, & Technology. McGraw-Hill Education.
  • Vollmann, T. E., Berry, W. L., Whybark, D. C., & Jacobs, F. R. (2020). Manufacturing Planning and Control for Supply Chain Management. McGraw-Hill Education.