Develop A Generic Project Change Control Methodology ✓ Solved
Develop a generic project change control methodology appropr
Develop a generic project change control methodology appropriate for most projects. The methodology or process must include the following elements:
- Change control procedures – policies and procedures for approving, validating, and implementing change.
- Change control plan – brief outline of how changes will be managed/controlled.
- Change control meetings and communication – describe how you will conduct change control meetings and communicate project changes to stakeholders.
- Change authorization procedures – levels of authority for reviewing/approving/implementing changes.
- Change control system(s) – project management information systems (PMIS) used for tracking and controlling changes (include at least one example of a template as part of your change control system).
Paper For Above Instructions
Executive summary
This paper defines a generic, scalable project change control methodology suitable for most projects and organizations. The methodology aligns with established project management standards (PMBOK) and ISO guidance, and covers procedures, a concise control plan, meeting and communication protocols, authorization levels, and practical change control systems including a sample change request template (Project Management Institute, 2017; ISO, 2012).
1. Change control procedures
Change control procedures provide a repeatable sequence of steps for intake, analysis, approval, implementation, and closure of all change requests. Core procedural steps include:
- Change intake: All change requests (CRs) must be submitted using the standardized Change Request Form in the PMIS and logged with a unique identifier (Kerzner, 2017).
- Initial triage: A configuration manager or change coordinator performs triage within 2 business days to validate completeness and classify urgency and impact (Schwalbe, 2015).
- Impact assessment: Assigned technical, schedule, cost, quality, and risk owners evaluate impacts and submit an Impact Assessment Report to the change control board (CCB) (PMI, 2017).
- Decision workflow: The CCB follows defined decision rules (approve, defer, reject, or require revision) and records rationale in the PMIS.
- Approval and authorization: Approved changes are assigned an implementation owner and scheduled into baseline updates following approval granularity rules (see authorization section).
- Implementation and verification: Changes are implemented, tested, and verified against acceptance criteria. The change record is closed only after verification and documentation updates.
- Audit and lessons learned: Periodic audits and a lessons-learned register maintain continuous improvement of the change process (ISO, 2012).
2. Change control plan
The Change Control Plan is a concise, living document embedded in the project management plan that describes how changes will be managed. Key plan components:
- Scope of control: Defines which items require formal change control (e.g., scope, schedule, cost, technical baselines, contractual deliverables) and which are managed informally.
- Roles and responsibilities: Identifies the change coordinator, CCB members, impact assessors, and implementation owners.
- Timeline and service levels: Establishes triage and assessment SLAs (e.g., triage in 2 business days, impact assessment in 5 business days for standard changes).
- Criteria for emergency changes: Defines expedited handling and emergency approval paths with retrospective review.
- Version control and baselines: Describes how baselines are updated, who signs them, and how historical records are stored.
- Tools and templates: Lists PMIS tools, templates, and reporting cadence for change metrics (change volume, approval times, rework caused by changes).
Embedding the plan in the project management plan ensures consistent expectations across stakeholders and supports traceability throughout the project lifecycle (PMI, 2017).
3. Change control meetings and communication
Effective meetings and communications ensure stakeholders are informed and decisions are transparent. Recommended approach:
- Weekly CCB meetings: Regularly scheduled virtual or in-person meetings for routine changes with an agenda distributed 24 hours in advance and summary minutes recorded in the PMIS (Kerzner, 2017).
- Ad-hoc emergency sessions: For high-impact or time-critical changes, an expedited CCB convenes within agreed SLAs and documents decisions with post-implementation review.
- Stakeholder notifications: Use tiered notifications—immediate alerts for impacted teams, weekly digests for sponsors, and monthly summary dashboards for executives. Communications include CR status, impact summaries, and schedule effects (Schwalbe, 2015).
- Transparency and traceability: Publish CCB decisions, minutes, and impact assessments in a change register accessible via the PMIS to support auditability and stakeholder trust (ISO, 2012).
4. Change authorization procedures
Authorizations must be proportional to impact and risk. A three-tier authorization model works for most projects:
- Tier 1 — Low-impact changes: Minor, no-cost changes affecting only a single work package. Authorization by the project manager (PM) or functional lead.
- Tier 2 — Moderate-impact changes: Changes that affect multiple work packages or have cost/schedule implications up to a predefined threshold. Authorization by the CCB or program manager.
- Tier 3 — High-impact changes: Major scope, budget, contractual, or strategic changes exceeding thresholds require sponsor or steering committee approval and, where applicable, formal contract amendments (PMI, 2017).
Each tier lists required artifacts for approval (impact assessment, cost estimate, schedule revision, risk mitigation plan) and sign-off authorities. Emergency change authorizations allow temporary approvals with documented retrospective review to validate governance compliance (AXELOS, 2017).
5. Change control systems and template example
An effective PMIS supports logging, routing, version control, traceability, dashboards, and audit trails. Typical systems include commercial project portfolio management tools (e.g., Microsoft Project Server, Jira, ServiceNow, CA Clarity) or integrated ERP modules (Kerzner, 2017; Schwalbe, 2015).
Functional capabilities required:
- Change request intake forms with attachments
- Automated routing and notifications
- Version-controlled baseline updates
- Dashboards for change metrics and impact visualization
- Role-based access and audit logs (ISO, 2012)
Sample Change Request Template (fields):
| Field | Description |
|---|---|
| Change ID | Unique identifier assigned by PMIS |
| Title | Concise change title |
| Date Submitted / Requester | Submission date and requester contact |
| Description | Detailed description of change and justification |
| Impacted Areas | Scope, schedule, cost, quality, risks, stakeholders |
| Priority / Urgency | Business priority and required response time |
| Impact Assessment Summary | Estimated cost delta, schedule delta, resource needs |
| Recommendation | Approve / Defer / Reject and proposed remediation |
| Approvals | Signatures (PM, CCB, Sponsor) and dates |
| Implementation Details | Implementation owner, start/end dates, verification criteria |
| Status | Open / Approved / Implemented / Closed |
Conclusion
This generic change control methodology balances governance and flexibility. It uses proportional authorization, defined SLAs, transparent communication, and a PMIS-enabled change register to control risk while enabling necessary adaptation. Embedding the procedures and plan into the project management plan and using a standardized template increases repeatability, reduces rework, and supports auditable decision-making (PMI, 2017; Kerzner, 2017).
References
- Project Management Institute. (2017). A Guide to the Project Management Body of Knowledge (PMBOK Guide) — Sixth Edition. Newtown Square, PA: PMI.
- Kerzner, H. (2017). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (12th ed.). Hoboken, NJ: Wiley.
- Schwalbe, K. (2015). Information Technology Project Management (8th ed.). Boston, MA: Cengage Learning.
- International Organization for Standardization. (2012). ISO 21500:2012 Guidance on project management. Geneva: ISO.
- AXELOS. (2017). Managing Successful Projects with PRINCE2. London: The Stationery Office.
- Armenakis, A. A., & Bedeian, A. G. (1999). Organizational change: A review of theory and research in the 1990s. Journal of Management, 25(3), 293–315.
- Kotter, J. P. (1996). Leading Change. Boston, MA: Harvard Business School Press.
- Pinto, J. K. (2010). Project Management: Achieving Competitive Advantage (3rd ed.). Upper Saddle River, NJ: Prentice Hall.
- Love, P. E. D., Edwards, D. J., & Irani, Z. (2008). Forensic project management: An exploratory examination of the causal behavior of design-induced errors in construction. Automation in Construction, 17(6), 749–758.
- Jørgensen, M., & Shepperd, M. (2007). A systematic review of software development cost estimation studies. IEEE Transactions on Software Engineering, 33(1), 33–53.