M8 Assignment Quality Management Plan For This Week's Indivi

M8 Assignment Quality Management Planfor This Weeks Individual Exerc

For this week’s individual exercise, create a Project Quality Management Plan for the project involving building a garage. Select two of the following deliverables: Foundation, Roof, Doors & Windows (including installation), Electrical work, Door Opener (including installation). Complete the quality management template by defining standards, metrics, tasks, and activities to ensure quality for each selected deliverable.

Paper For Above instruction

The process of developing a comprehensive Quality Management Plan (QMP) for a construction project like building a garage necessitates meticulous planning, standards setting, and continuous evaluation to ensure the delivery meets the specified quality requirements. For this assignment, I will focus on two critical deliverables: the foundation and electrical work, as they play vital roles in the structural integrity and functionality of the garage.

Foundation

Defining a standard for the foundation involves adhering to established building codes and engineering best practices. The metric for assessing quality will be the acceptance of the foundation according to the ASTM International standards, specifically ASTM C94/C94M for ready-mixed concrete, ensuring compressive strength and durability. To build quality into the foundation, the first step is to ensure proper site preparation, including soil testing and clearance, which reduces risks of future settling or failure. The second step is to implement a rigorous inspection process during concrete pouring and curing, to monitor consistency and adherence to specifications. To guarantee that quality management is integrated into the project, a dedicated task will be added to conduct routine inspections and to review testing results at predefined milestones as part of the project schedule, implementing corrective actions promptly if deviations are found.

Electrical Work

For electrical wiring, the standard used to determine quality will be compliance with the National Electrical Code (NEC) and local electrical safety standards. The measurement will be through a detailed inspection report verifying adherence to wiring diagram specifications and safety codes, along with testing the electrical system for proper insulation resistance and functionality. To ensure quality, the first step involves pre-qualification of electricians and their certification to ensure they are qualified workers. The second step is conducting inspection and testing at each stage of wiring installation, including a final inspection and load testing before energization. To include quality management activities, the plan will incorporate scheduled inspections, supervision during wiring, and documentation of testing results as tasks in the project schedule, ensuring promptly addressing issues detected during inspections.

The overarching goal of the Quality Management Plan in this project is to minimize rework and defects, thus reducing costs and time delays. Emphasizing standards compliance and continuous evaluation ensures the project’s deliverables meet or exceed stakeholder expectations, thereby increasing stakeholder satisfaction and project success.

In addition to these strategies, engaging stakeholders such as the project owner, engineers, and inspectors from the planning phase fosters a culture of quality and aligns expectations. Regular audits and feedback loops enable early detection of issues, facilitating corrective actions and fostering continuous improvement throughout the project lifecycle.

References

  • American Society for Testing and Materials (ASTM). (2018). ASTM standards for concrete and construction materials. ASTM International.
  • National Electrical Code (NEC). (2020). Article 300: Wiring methods. National Fire Protection Association.
  • Project Management Institute. (2021). A Guide to the Project Management Body of Knowledge (PMBOK® Guide). PMI.
  • Kerzner, H. (2017). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. Wiley.
  • Juran, J. M., & Godfrey, A. B. (1999). Juran's Quality Control Handbook. McGraw-Hill.
  • Li, Y., Zhang, X., Ding, G., & Feng, Z. (2016). Developing a quantitative construction waste estimation model for building construction projects. Resources, Conservation and Recycling, 106, 9-20.
  • ISO 9001:2015. (2015). Quality management systems — Requirements. International Organization for Standardization.
  • Standards Australia. (2018). Building Code of Australia (BCA). Australian Standards.
  • Harvey, D. (2010). Modern Construction Management. Wiley-Blackwell.
  • El-Sayegh, S. (2018). Construction Quality Management: A Practical Guide. Taylor & Francis.