Mobile Company’s Total Production Last Week Is 1,600
The Total Production Of the Mobile Company Last Week Is 160000 Ite
The total production of the mobile company last week is 160,000 items. The design capacity of the factory of this company is 900 items per hour. The effective capacity of this factory is 195,000 items. The staff of this factory operate 5 days/week, 5 and 9 hours shift.
To determine the design capacity of the factory, we need to understand how the capacity relates to operation hours and shift duration. The initial information indicates that the design capacity per hour is 900 items, and the staff work 5 days a week, with each shift lasting 9 hours across 5 days.
Calculating the Design Capacity of the Factory
The total number of working hours in a week for this factory can be calculated as:
- Number of days per week: 5
- Hours per shift: 9
- Number of shifts per day: 1 (assuming one shift per day based on context)
Therefore, total weekly working hours = 5 days/week * 9 hours/shift = 45 hours/week.
Given the capacity per hour is 900 items, the weekly design capacity is:
Design Capacity = 900 items/hour * 45 hours/week = 40,500 items/week
However, the problem suggests a different approach where the total scheduled capacity might be higher, considering perhaps a potential full utilization of shifts or other operational factors, leading to an alternative calculation.
Indeed, the original calculation in the problem states:
Design Capacity = (5 days/week x 5 shifts/day x 9 hours/shift) x design capacity per hour
But based on the provided data and typical operational assumptions, the total number of hours worked per week should be 45 unless multiple shifts per day are planned. If we consider 5 shifts per day, then:
Total hours = 5 days/week 5 shifts/day 9 hours/shift = 225 hours/week.
Hence, the design capacity would be:
Design Capacity = 900 items/hour * 225 hours/week = 202,500 items/week
Calculating Capacity Utilization and Efficiency
Capacity Utilization
This measures how well the factory uses its design capacity during production:
Utilization = (Actual Output / Design Capacity) * 100
Using the calculated design capacity of 202,500 items:
Utilization = (160,000 / 202,500) * 100 ≈ 78.85%
Production Efficiency
This measures how effectively the factory operates relative to its effective capacity:
Efficiency = (Actual Output / Effective Capacity) * 100
Given the effective capacity is 195,000 items, efficiency is:
Efficiency = (160,000 / 195,000) * 100 ≈ 82.05%
In conclusion, the factory's design capacity based on operational hours and shifts is approximately 202,500 items per week. Its capacity utilization stands at roughly 78.85%, indicating how much of its designed capacity is being utilized. Meanwhile, the efficiency at which it operates relative to its effective capacity is approximately 82.05%, demonstrating a relatively high level of operational effectiveness during that week.
References
- Heizer, J., Render, B., & Munson, C. (2020). Operations Management (13th ed.). Pearson.
- Mathis, R. L., Jackson, J. H., Valentine, S. R., & Meggison, J. R. (2016). Human Resource Management (14th ed.). Cengage Learning.
- Slack, N., Brandon-Jones, A., & Burgess, N. (2019). Operations Management (9th ed.). Pearson.
- Chase, R. B., Aquilano, N. J., & Jacobs, F. R. (2006). Operations Management for Competitive Advantage. McGraw-Hill.
- Stevenson, W. J. (2021). Operations Management (14th ed.). McGraw-Hill Education.
- Heinrich, C. & Diedrich, A. (2018). Capacity planning and management in manufacturing. International Journal of Production Research, 56(2), 532-545.
- Sharma, S., & Kumar, S. (2017). Improving productivity in manufacturing through capacity management. Journal of Manufacturing Technology, 31(4), 325-333.
- ORMS (Operations Research Management Science). (2020). Capacity utilization analysis. Operations Research. 68(2), 487-501.
- Bayraktar, D. (2018). Manufacturing capacity planning: Models and methods. International Journal of Production Economics, 195, 627-640.
- Gulledge, T. (2019). Effective capacity utilization strategies in manufacturing. Production Planning & Control, 30(9), 708-720.