Production Plan 2 Semiannual Production Plan

Production Planproduction Plan 2semiannual Production Planmba 690feb

The production plan created will be a semiannual one (6 months), using notional demand and inventory. Notional demand is the aggregate goods quantity that will be demanded if all the markets are to be in equilibrium during the period the production plan is to be valid (Stevenson & Sum, 2002). The labor hours consumed will also be estimated. In addition, there will be an estimate of the number of worker requirements with consideration for the standard work week, current inventory levels, receipts of new inventory during each month, and varying demand levels for each month of production.

Given an estimated notional demand of 19,500 units, the average notional demand should be 19,500/6 which is equal to 3,250 per month (Dey, Cheffi, & Nunes, 2014). To produce these units per month given a standard labor rate of 0.64, the workforce required will be: 3,250 * 0.64 = 2,080 units. Units per hour given 160 regular hours available = 2,080 / 160 = 13 workers. Opening inventory is 2,500 units. The current workforce is 14 workers. Regular hours available are 160, and overtime hours available are 20. The standard of labor is 0.64.

Demand for each month, production requirements, cumulative demand, cumulative production, and excess or shortage units are determined to align with the demand forecast, inventory levels, and workforce capacity. Since the workforce needed is 13 workers, the company will have to lay off one worker to minimize costs while maximizing profit.

The estimated production costs include materials, labor, and layoffs, totaling $976,000 for the six-month period. Material costs are based on the total units demanded (19,500), costing $780,000, and labor costs at $195,000. Layoff costs are estimated at $1,000 for one worker. This production plan ensures alignment with market demand, balanced labor utilization, and cost efficiency, providing a strategic framework to introduce the new products into the market efficiently.

Paper For Above instruction

Developing an effective semiannual production plan is critical for aligning manufacturing capacity with market demand, optimizing resource utilization, and minimizing costs. The process begins with estimating notional demand, which reflects the total expected sales volume over the specified period, assuming a state of market equilibrium. For this scenario, the notional demand is 19,500 units over six months, translating to an average monthly demand of 3,250 units (Dey, Cheffi, & Nunes, 2014). This demand estimation guides the production schedule and resource allocation across the six-month timeframe.

To support this demand forecast, it is essential to calculate the labor hours required. Given a standard labor rate of 0.64, the monthly labor requirements can be approximated by multiplying the demand by the labor rate: 3,250 units * 0.64 = 2,080 labor units per month. With a standard 160-hour workweek, this equates to approximately 13 workers needed per month (2080 / 160). Considering that the current workforce comprises 14 workers, and the company's operational hours include 160 regular hours plus 20 overtime hours, adjustments in workforce size and scheduling are necessary to achieve cost efficiency without compromising productivity.

Inventory management plays a vital role in this plan, involving the tracking of opening inventory levels—2,500 units—and the receipt of new inventory during each month. Analyzing these variables alongside demand fluctuations ensures that inventory levels are neither excessive nor insufficient, preventing overstocking or stockouts. The production schedule must consider cumulative demand and production achievements, with adjustments made for excess units or shortages, to maintain a steady flow of goods and meet market needs.

Cost analysis is integral to the planning process, encompassing direct manufacturing expenses and associated costs of workforce adjustments. The total estimated cost for material procurement is $780,000, based on the demand quantity, while labor costs amount to $195,000, reflecting a standardized labor rate. Layoff costs are estimated at $1,000, representing the expense incurred by reducing the workforce by one employee. The comprehensive production cost approximates $976,000 over the semiannual period, aligning financial planning with operational objectives.

This strategic plan emphasizes balancing demand fulfillment with cost control, workforce management, and inventory optimization. By carefully estimating labor hours, aligning workforce requirements with demand fluctuations, and controlling costs, the company can efficiently introduce its new product into the marketplace. Regular monitoring and adjustment of the production schedule ensure responsiveness to market conditions, supporting long-term competitiveness and profitability.

References

  • Dey, P. K., Cheffi, W., & Nunes, B. (2014). Production Planning & Control. Production Planning & Control, 25(9), II.
  • Johnson, L. A., & Montgomery, D. C. (1974). Operations research in production planning, scheduling, and inventory control (Vol. 6). Wiley.
  • Stevenson, W. J., & Sum, C. C. (2002). Operations management (Vol. 8). McGraw-Hill/Irwin.
  • Hopp, W. J., & Spearman, M. L. (2008). Factory physics (3rd ed.). Waveland Press.
  • Heizer, J., Render, B., & Munson, C. (2016). Operations management (12th ed.). Pearson.
  • Slack, N., Brandon-Jones, A., & Burgess, N. (2019). Operations management (9th ed.). Pearson.
  • Chase, R. B., Jacobs, F. R., & Aquilano, N. J. (2006). Operations Management for Competitive Advantage. McGraw-Hill.
  • Goldratt, E. M., & Cox, J. (2004). The Goal: A Process of Ongoing Improvement. North River Press.
  • Vollmann, T. E., Berry, W. L., Whybark, D. C., & Jacobs, F. R. (2005). Manufacturing Planning and Control for Supply Chain Management. McGraw-Hill.
  • Heiner, C. R. (2011). Manufacturing Planning and Control for Supply Chain Management. McGraw-Hill Education.