Project Managers Often Use Earned Value Management (E 254636
Project Managers Often Use Earned Value Management Evm If They Want
Assume that your project is using more resources (e.g., time, money, and/or other non-labor resources, etc.) than anticipated through 50% of the project duration. Update the project schedule to reflect related resource changes. Produce a series of EVM reports from MS Project that illustrate your project’s performance. Your reports should focus on the cost and schedule performance of the project.
Write a two to three (2-3) page paper in which you: summarize the resource changes of your project, discuss the performance results of your project, determine one (1) performance measurement baseline for your MS Project and justify your response, and apply earned value analysis (EVA) to forecast future cost issues and justify your response.
Paper For Above instruction
The effective management of project resources and performance measurement is critical for the successful delivery of any project. This paper analyzes a project scenario where resources have been over-utilized at the halfway point, explores the project's performance through earned value management (EVM), and forecasts future cost issues based on the current status.
Resource Changes and Performance Results
By the midpoint of the project, there was an unexpected surge in resource utilization beyond initial estimates. Specifically, actual costs eclipsed the baseline allocations, which suggests that either the project experienced scope creep, inefficiencies, or unforeseen complications. This increase in resource consumption—covering labor, equipment, and other non-labor costs—resulted in a Cost Performance Index (CPI) of less than 1, indicating cost overruns. Simultaneously, schedule performance indicated delays, with a Schedule Performance Index (SPI) lower than 1, reflecting that less work was completed than planned relative to the schedule.
These findings demonstrate that the project is currently over budget and behind schedule. The primary factors contributing to these issues include unforeseen technical challenges, resource misallocations, or inadequate initial planning. The project's Earned Value (EV) at 50% duration was lower than the Planned Value (PV), indicating underperformance in work completion, compounded by higher actual costs (AC), highlighting the need for corrective actions to realign project execution.
Performance Measurement Baseline
A single performance measurement baseline (PMB) was established at the project's inception, incorporating scope, schedule, and cost plans, with defined milestones. For this scenario, the baseline was justified by setting clear, measurable objectives aligned with project scope. It served as a reference to evaluate variances and performance indices. Maintaining a documented baseline is essential for assessing project health, facilitating variance analysis, and supporting decision-making, especially when resource variances emerge.
Forecasting Future Cost Issues Using Earned Value Analysis
Applying EVA, future cost and schedule forecasts are derived from current variances. The Estimate at Completion (EAC) is calculated by dividing the Budget at Completion (BAC) by the CPI, predicting higher final costs due to current overruns. As the CPI indicates underperformance, the EAC suggests the project will likely exceed the initial budget if corrective measures are not undertaken. Furthermore, the Variance at Completion (VAC) predicts the remaining budget deficit, signaling the need for scope adjustments or increased resources.
In conclusion, the analysis underscores the importance of continuous performance monitoring using EVM techniques. The resource over-utilization and performance variances highlight areas requiring management interventions. EVM functions as a valuable tool for forecasting cost overruns and schedule delays, enabling proactive corrective actions to ensure project success. Future project performance can be improved with diligent rebaselining, enhanced resource control, and rigorous variance analysis.
References
- Charvat, J. (2014). Agile Project Management: A Practitioner’s Guide. John Wiley & Sons.
- Kelley, S., & Walker, D. (2019). Fundamentals of Earned Value Project Management. PMI.
- Kerzner, H. (2017). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. John Wiley & Sons.
- PMI. (2017). A Guide to the Project Management Body of Knowledge (PMBOK® Guide). Project Management Institute.
- Fleming, Q., & Koppelman, J. (2016). Earned Value Project Management. Project Management Institute.
- Leach, L. P. (2014). Critical Chain Project Management. Artech House.
- Meredith, J. R., & Mantel, S. J. (2014). Project Management: A Managerial Approach. Wiley.
- Rosenblatt, K., & Stark, A. (2018). Managing Project Risk. Project Management Journal, 49(2), 123–134.
- Hubbard, D. W. (2014). The Failure of Risk Management: Why It’s Broken and How to Fix It. Wiley.
- Vanhoucke, M. (2012). Measuring Time and Cost Overrun Using Earned Value Management. International Journal of Project Management, 30(2), 146–157.