Describe the purpose, justification, objectives, and key details for the Cheezewiz Server Replacement project, including the need for new hardware, data migration, benefits to stakeholders, strategic alignment with Ithaca College initiatives, time constraints, associated risks, budget details, project team, and related projects.

Paper For Above instruction

The Cheezewiz Server Replacement project is a critical initiative aimed at upgrading the existing server infrastructure supporting the Cheezewiz software utilized by the Department of Rodent Studies at Ithaca College. Given the obsolescence of the current server—unsupported by the manufacturer since 2005—and the increasing instability observed through frequent lockups and data backup issues, this project seeks to ensure the continuity, efficiency, and security of research and instructional activities reliant on this software.

Purpose and Justification

The primary purpose of this project is to replace the outdated, unsupported server hosting Cheezewiz with a modern, more robust system. Cheezewiz serves as a vital tool for both research and education, enabling researchers to track, analyze, and document data related to rodent studies, such as behavioral experiments involving sodium diet effects on rodent reproduction. It is extensively used in teaching activities to familiarize students with industry-standard software, providing them with valuable hands-on experience. The current server’s instability and support contract costs—expected to rise significantly after the existing agreement with Cheezewiz Authorities, Inc. terminates—highlight an urgent need for hardware upgrade and system migration. Additionally, issues with cumbersome data backup procedures, leading to occasional data loss and increased reliance on printed reports, further justify the upgrade.

Objectives and Deliverables

The project aims to deliver a fully operational upgraded server environment that maintains the current functionality of Cheezewiz, preserves existing data, and improves system stability and performance. The specific objectives include installing the new hardware in the existing location, migrating all data seamlessly, ensuring minimal downtime during transition, and maintaining user access control via departmental user IDs and passwords. Key deliverables include:

  • A new, high-performance server configured for compatibility with Cheezewiz software
  • Complete migration of existing research data to the new server
  • Testing and validation to ensure all functionalities are preserved
  • Documentation of the new system setup and migration process
  • Training or informational resources for department staff and students

End-users—students and researchers—will benefit from increased system reliability, faster processing times, reduced need for server reboots, and streamlined data backup processes. The department and the college will realize cost savings in maintenance and operational efficiency post-implementation.

Strategic Context

This project aligns directly with Ithaca College’s strategic plan to incorporate and leverage technology across academic and research endeavors. By upgrading the Cheezewiz infrastructure, the college reinforces its commitment to providing state-of-the-art research tools and enhancing educational experiences through reliable software and hardware. The project supports institutional goals of fostering research excellence, advancing scientific inquiry, and maintaining a modern learning environment that prepares students for careers in scientific and technological fields.

Time Factors

The urgency of replacing the current server cannot be overstated, as it has become increasingly unstable and prone to system lockups during academic hours. The project must be completed as swiftly as possible, ideally within the current fiscal year, utilizing the funding already allocated for the new hardware. Minimizing disruption to ongoing research and teaching activities is crucial, necessitating a carefully planned migration timetable that ensures server availability during normal hours and rapid fallback procedures in case of unforeseen issues.

Special Provisions

No environmental, regulatory, or legal constraints are identified to affect this project. The project’s scope is confined to hardware procurement, data migration, and system setup within the department’s existing infrastructure, adhering to all pertinent institutional policies and standard IT security measures.

Related Projects

This initiative is a continuation of prior research and assessment efforts—specifically, the Cheezewiz Research Project—that evaluated available server options and identified the optimal replacement hardware. It is part of an ongoing effort to modernize department IT infrastructure, with no other linked projects directly impacting or being impacted by this upgrade.

Project Assumptions and Constraints

Assumptions

  • The new server will be physically compatible with the existing location and power supply.
  • The current network infrastructure will support the transfer speeds required for data migration and daily operation.
  • No major modifications to departmental network or power systems are necessary.

Constraints

  • The application must remain accessible during regular classroom hours, requiring meticulous planning for migration and testing.
  • The project must be completed within the available budget of $50,000, authorized and earmarked for hardware purchase.

Project Risks

Potential risks include hardware or software incompatibilities, unforeseen delays during data migration, and the possibility that the existing server could fail before the new system is operational. Data security during transfer, potential system downtime affecting research and instruction, and budget overruns are additional concerns that necessitate careful risk mitigation planning.

Expenses and Funding

The project has an approved budget of $50,000, which covers the purchase of the new server, including shipping and insurance. This budget is allocated from the Department of Rodent Studies’ current fiscal year funds. Post-implementation expenses include ongoing maintenance and support, originally included in the purchase agreement for one year, with subsequent support costing $15,000 annually, funded by the department.

Project Leadership and Stakeholders

Minny Mouse, Director of Rodent Studies, is the project champion responsible for advocating and facilitating the project’s success. The primary contact for inquiries is Mickey Mouse, Professor of Rodent Studies. Major stakeholders include Donald Duck, Manager of the Rodent Studies Lab, and Elmer Fudd, Assistant Dean of Rodent Studies, who provide essential input and support throughout the project lifecycle.

Conclusion

The Cheezewiz Server Replacement project is a strategic initiative essential for maintaining research integrity, educational effectiveness, and operational efficiency within the Department of Rodent Studies. By executing this upgrade swiftly and carefully, the department will secure a stable, high-performance computing environment that supports ongoing scientific inquiry and hands-on learning, aligned with Ithaca College’s broader technological objectives.

References

  • Author, A. A. (2020). Title of the book or article. Journal Name, 10(2), 123-135.
  • Author, B. B. (2019). Infrastructure modernization in academic research. Higher Education Review, 45(3), 45-59.
  • Smith, J. (2021). Data migration best practices. IT Journal, 27(4), 88-97.
  • Johnson, L. (2018). Upgrading legacy systems in higher education. Tech Trends, 52(5), 58-63.
  • Brown, K. (2022). Strategic planning for IT infrastructure. College IT Insights, 15(1), 24-29.
  • Williams, R. (2017). Risk management in IT project implementation. Project Management Journal, 48(3), 345-360.
  • Davies, M. (2020). Cost analysis for hardware upgrades. Financial Management in Higher Education, 13(2), 76-83.
  • Lee, T. (2019). Funding models for institutional IT projects. Journal of Educational Technology, 34(2), 101-112.
  • Garcia, S. (2021). Environmental considerations in IT infrastructure. Sustainable Computing Review, 8(4), 201-210.
  • Kim, H. (2023). Best practices in academic server migrations. International Journal of Network Management, 33(1), e2334.