Assemble a detailed construction estimate to construct the Medical Clinic as per the attached plans and specifications. Bids will be opened publicly in class. Detailed estimates shall be submitted in spreadsheet form with costs broken down into the 16 divisions as per the Masterformat coding system. All assumptions shall be listed on a separate sheet and attached to the estimate. It is expected that your detailed estimate will be a complete estimate which covers every item necessary to construct this facility.
As part of the proposal, you will submit alternate #1 for the add or deduct amount to install the foundation as per sheet S-1A and alternate #2 for the add or deduct amount to construct masonry walls as per sheet S-1B in lieu of the wood framing as specified. In addition, you will submit an alternate price for each of alternate items #3, 4, and 5 as indicated in the project specifications. Please disregard the soils report section, it is not applicable. I have made some minor modifications to the plans by hand in an effort to clarify some items and make others more applicable to this region. In your estimate, in the appropriate sections, please carry a line item allowance of $50,000 for medical equipment and $2,300 for lighting fixtures.
Paper For Above instruction
The task of creating a detailed construction estimate for the Medical Clinic involves systematic breakdown and accurate costing of all necessary components, adhering to the Masterformat coding system. This process requires a comprehensive understanding of construction processes, materials, and the specific plans provided. The estimation process begins with a thorough review of the provided plans and specifications, including the architectural, structural, and MEP (mechanical, electrical, and plumbing) details. Each division within Masterformat (generally divisions 01 through 16) must be meticulously analyzed to identify all elements and associated costs.
Division 01, General Requirements, encompasses project management, temporary facilities, and site safety costs. Divisions related to site work, such as excavation, grading, and paving, are included early in the estimate, ensuring site preparation costs are accurate. Structural components involve detailed calculation of foundation systems, framing, and superstructure costs. The estimate must account for alternate bids, such as modifications to foundation and masonry wall construction, as specified in sheets S-1A and S-1B. These alternates require careful analysis of cost impacts and potential savings or additions based on different construction methods or materials.
Interior and exterior finishes, including Wall coverings, flooring, and specialized clinic finishes, are detailed in their respective divisions. Mechanical systems such as HVAC, plumbing, and fire protection are estimated based on the specifications, considering system sizes, efficiencies, and equipment costs. Electrical systems, including lighting fixtures, emergency systems, and power distribution, are integrated into the estimate, with allowances set aside for specific lighting costs ($2,300) and medical equipment ($50,000). These allowances are set to ensure the project budget remains flexible for equipment procurement.
The estimate must include all assumptions explicitly, such as material costs, labor rates, delivery schedules, and any site-specific conditions that may impact costs. These assumptions are documented separately to promote transparency and facilitate potential adjustments during bid evaluations. The estimate is expected to be thorough, covering every necessary item—from excavation and foundation work to final finishes and commissioning.
In preparing the estimate, the estimator should incorporate contingency allowances and escalation factors appropriate to the project timeline and regional market conditions. The estimate should be compiled in a spreadsheet, with clear line items and subtotal calculations, enabling easy review and adjustment. Alternate estimates for specified components provide flexibility for project owners to evaluate different construction options and costs.
Ultimately, this detailed estimate will serve as the basis for the bid submission, reflecting an accurate and complete projection of the project's total cost. It is essential that the estimate aligns closely with the project scope, specifications, and intended level of detail to ensure competitiveness and profitability in the bidding process.
References
- Construction Specifications Institute. (2020). MasterFormat: Structuring Construction Specifications. CSI.
- Edwards, D. J. (2019). Construction Cost Estimating. CRC Press.
- Kelley, R., & Humphreys, M. (2017). Estimating Construction Costs. McGraw-Hill Education.
- Farjo, M., & Mather, R. (2018). Construction Planning, Equipment, and Methods. Pearson.
- Gallaher, M. P., & Crawford, A. (2019). Building Construction Cost Data. RS Means.
- Chen, Z., & Hsieh, C. (2021). Cost Estimation and Cost Control in Construction Projects. Wiley.
- Chini, A. R., & Guy, S. (2016). Project Management for Construction. Routledge.
- Schwalbe, K. (2018). Information Technology Project Management. Cengage Learning.
- National Institute of Building Sciences. (2018). Construction Cost Estimating Guide. NIBS.
- American Society of Civil Engineers. (2020). Civil Engineering Standard Practice Manual. ASCE.