Work Breakdown Structure For District 4 Warehouse Pro 152681
Sheet1work Breakdown Structureproject Namedistrict 4 Warehouse Movepr
Identify the work to be done, the resources required, and develop estimates for each work element, specifically in the context of a warehouse relocation project for District 4 of Trillo Apparel Company (TAC). This project involves moving and renovating a facility within a four-month timeline, with detailed tasks including permits, construction, equipment packing, moving operations, and final project closure.
Paper For Above instruction
The District 4 Warehouse Move project at Trillo Apparel Company represents a complex initiative requiring meticulous planning, resource allocation, and scheduling to ensure minimal disruption and meet tight deadlines. The project aims to relocate the district’s production and shipping operations approximately 10 miles away, ensuring increased capacity to generate an additional $1 million annually. This strategic move supports the company’s broader goal of enhancing production efficiency and revenue growth, particularly in the context of urban expansion and operational scaling.
Effective project management begins with a clear delineation of the work breakdown structure (WBS). This involves identifying all task elements necessary for the complete and successful relocation of the warehouse, including site preparation, permits, construction, equipment handling, and commissioning. The WBS not only facilitates task assignment and resource planning but also aids in estimating costs and durations for each component, as detailed in the project documentation.
The initial phase includes project initiation activities such as securing location and stakeholder engagement, followed by documentation development—project charter, scope, WBS, project plan, and communication plan. These foundational steps set the groundwork for subsequent tasks. For example, permits for electrical, plumbing, and building work are critical prerequisites, with each requiring specific contractor involvement and time estimates (East Side Framing & Drywall, Sparks Electrical, Waterworks Plumbing).
Construction activities are sequential, adhering to permit approvals and inspection schedules. Framing, electrical, and plumbing work cannot commence until their respective permits are obtained and inspections are scheduled and passed. Specifically, framing must wait for permits, electrical and plumbing start as soon as framing concludes, and drywall can only begin after electrical and plumbing inspections are completed. This logical progression underscores the importance of detailed scheduling and contingency planning within the overall project timeline, which is tightly constrained to four months.
Following the initial construction, drywall installation and finish work constitute the subsequent phases. Drywall installation depends on inspections, and final inspections are required for occupancy and certification. Drywall, finishing, and workbench fabrication are scheduled to occur in parallel as permitted, maximizing efficiency. The process includes ordering and building workbenches, which can be prepared before the move, allowing for reduced downtime and immediate post-move productivity.
Equipment packing and move operations are critical path activities that must be tightly coordinated. Contracted services from City Equipment Movers and Express Moving Company are estimated at five days each, with move dates aligned to minimize production interruptions. The move itself, scheduled for a five-day window, necessitates precise coordination to avoid extended downtime that could cost the company approximately $250,000 weekly, given daily revenues of $50,000.
The project concludes with procurement closure activities such as reviewing contracts, releasing contractors, and paying invoices, followed by formal project closure procedures: final reporting, documentation archiving, and lessons learned sessions. These steps ensure accountability, knowledge transfer, and continuous improvement for future projects.
Throughout the project, resource management involves assigning specific teams, such as student workers for finish work and carpenters for benches, with detailed estimates of duration and resource needs. The project team must also monitor progress frequently, adjusting schedules as needed based on inspection delays or permit procurement issues.
This structured approach ensures that all aspects of the warehouse move are accounted for—permitting complexities, construction dependencies, and logistical operations—aligning with TAC’s strategic goals to expand capacity efficiently and cost-effectively within a strict four-month timeframe.
References
- PMI (2017). A Guide to the Project Management Body of Knowledge (PMBOK Guide). 6th Edition. Project Management Institute.
- Kerzner, H. (2013). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. 11th Edition. Wiley.
- Meredith, J. R., & Mantel, S. J. (2014). Project Management: A Managerial Approach. 8th Edition. Wiley.
- Jha, K. N., & Iyer, K. C. (2007). Critical success factors for effective project management. Benchmarking: An International Journal, 14(1), 37-57.
- Larson, E. W., & Gray, C. F. (2017). Project Management: The Managerial Process. 7th Edition. McGraw-Hill Education.
- Gido, J., & Clements, J. (2014). Successful Project Management. 6th Edition. Cengage Learning.
- Heldman, K. (2018). Project Management JumpStart. 3rd Edition. Wiley.
- Schwalbe, K. (2015). Information Technology Project Management. 8th Edition. Cengage Learning.
- Harrison, F. L., & Lock, D. (2017). Advanced Project Management: A Structured Approach. 3rd Edition. Gower Publishing.
- Thamhain, H. J. (2014). Managing Technology Projects: Into the Future. Wiley.