Criteria Analysis Completed For Historical Performance Data
Criteriaanalysis Completed For The Historical Performance Data Provi
Criteria analysis completed for the historical performance data provided.
Summary of descriptive statistics completed for the historical performance data provided. These summaries should be located within a separate worksheet, separate file, or displayed clearly within the provided data file. The analysis must be easily accessible within the SharePoint file or in a separate uploaded file.
Construction of the precedence diagram based on the data provided in the group’s data file. The diagram can be a rough, draft, sketch, or finished version and must be uploaded to the group's folder in SharePoint. Acceptable formats include Word, PDF, CAD (.DRWG), Visio, Excel, PowerPoint, or a hand-sketch labeled as “Precedence Diagram_Group(###)”.
TAKT time calculator tool (formula) established within a spare worksheet in the group’s data file. The tool should calculate TAKT time based on inputs such as "available time" and "customer demand." The calculator must allow re-calculations when input variables are changed, demonstrating understanding of how to plan and assign these variables based on provided data and classroom discussions.
Evidence of a workstation assignment table created within the group’s data file or as a separate SharePoint file. The table does not need to be complete but should show that setup has begun and some progress has been made toward establishing workstations.
A small project plan listing remaining activities over the next 2-3 weeks must be uploaded to the SharePoint. The plan should detail:
- Who is responsible for each activity
- By when each activity is expected to be completed
The plan must clearly assign responsibilities to group members and target activities for completion prior to the project/report deadline.
Paper For Above instruction
The assignment encompasses a comprehensive analysis and planning process essential for project management and operational optimization. It begins with a finished criteria analysis of the historical performance data, detailed descriptive statistics, and an accessible organization of this information. These statistical summaries provide foundational insights into past performance, enabling data-driven decision-making and strategic planning. The clarity and accessibility of these summaries are crucial, whether integrated within the raw data or presented separately, to facilitate efficient review and analysis.
Building on this data foundation, the construction of a precedence diagram is a central element. This diagram visually depicts the sequence and dependencies of tasks necessary to achieve project objectives. Whether drafted in initial form or in a more refined state, the diagram’s purpose is to illustrate workflow logic. Proper labeling and format is vital, with many acceptable tools including Word, PDF, CAD, Visio, Excel, PowerPoint, or hand sketches. This visual guide aids in understanding task flow, resource allocation, and potential bottlenecks, thereby streamlining project execution.
The project further requires the development of a TAKT time calculator embedded within the project data file. This calculator is pivotal for balancing production efficiency with customer demand. It should incorporate flexible input variables like available working time and customer demand rates, ensuring that changes in inputs dynamically recalibrate TAKT time outputs. This functionality demonstrates an understanding of key operational metrics and enhances planning accuracy, enabling the team to adapt to changing production conditions or demand fluctuations.
In addition, setting up a workstation assignment table is necessary as a preliminary step towards layout optimization. Although not required to be final, this table signifies an initial organization of tasks to workstations, supporting subsequent refinements. The activity underscores planning for productive resource allocation, workflow efficiency, and throughput improvements, serving as a foundational element for operational design.
The culmination of these planning efforts is the development of a detailed project timeline. This plan, submitted via SharePoint, must explicitly list remaining activities essential for project completion. Clear assignment of individual responsibilities ensures accountability, while set deadlines for each task foster timely progression. The plan’s purpose is to map out a strategic pathway, guaranteeing all activities are strategically aligned with the project deadline, thus promoting efficient project management and successful delivery.
Collectively, these elements—data analysis, visualization, operational calculation tools, layout planning, and project scheduling—constitute a thorough approach to project management in an operational context. They facilitate data-driven decisions, optimize workflow, and establish accountability, ultimately contributing to the successful execution of the project within the stipulated timeline and quality standards.
References
- Heizer, J., Render, B., & Munson, C. (2017). Operations Management (12th ed.). Pearson.
- Groover, M. P. (2014). Work Systems and the Methods, Measurement, and Management of Work (5th ed.). Pearson.
- Slack, N., Brandon-Jones, A., & Burgess, N. (2018). Operations Management (8th ed.). Pearson.
- Chase, R. B., Jacobs, F. R., & Aquilano, N. J. (2006). Operations Management for Competitive Advantage. McGraw-Hill.
- Womack, J. P., & Jones, D. T. (2003). Lean Thinking: Banish Waste and Create Wealth in Your Corporation. Free Press.
- Silberberg, M., & Silverberg, N. (2014). Queueing Theory and Telecommunications: Networks and Applications. Springer.
- Stevenson, W. J. (2018). Operations Management (13th ed.). McGraw-Hill Education.
- Goldratt, E. M., & Cox, J. (2004). The Goal: A Process of Ongoing Improvement. North River Press.
- Hopp, W. J., & Spearman, M. L. (2011). Factory Physics (3rd ed.). Waveland Press.
- Johnson, H. T., & Kaplan, R. S. (1987). Relevance Lost: The Rise and Fall of Management Accounting. Harvard Business Review.