Project Start And Duration Details
Sheet2project Start01idnamedurationstartfinish8120882081520822
Analyze a detailed project schedule for the Emergency Call Box Project 2020, including tasks, durations, start and finish dates, resources, and dependencies. Develop a Work Breakdown Structure (WBS) using MS Project that accurately estimates project costs by incorporating material costs, labor, and external labor rates, and perform calculations using formulas within the project management software.
Paper For Above instruction
The Emergency Call Box Project 2020 is a complex initiative that involves multiple tasks, resources, and cost considerations. Effective project planning and management are crucial to ensure timely completion within the allocated budget. This paper explores the process of developing a comprehensive project schedule, creating a WBS, and performing cost estimations using MS Project tools.
Introduction
Project management is an essential discipline for ensuring the successful delivery of infrastructure projects such as the installation of emergency call boxes across specified locations. A detailed schedule with clear task durations, resource assignments, and dependencies enables project managers to monitor progress, allocate resources efficiently, and control costs (PMI, 2017). The project under review involves site preparation, installation, wiring, testing, and troubleshooting activities that collectively contribute to the project's overall success. Incorporating a Work Breakdown Structure (WBS) and leveraging built-in formulas within MS Project allows for precise cost estimation and schedule optimization.
Project Schedule Development
The initial step involves compiling all project tasks with their respective durations and dependencies. For the Emergency Call Box Project, tasks such as site preparation, concrete mounting, inserting galvanized rods, and hardware procurement are sequenced logically to facilitate workflow. Resource assignments—such as project managers, site engineers, and telecommunication technicians—are mapped to each task, ensuring clarity on personnel involvement. Using MS Project, detailed Gantt charts visualize the timeline, illustrating overlapping tasks and critical dependencies (Kerzner, 2013). The schedule spans from August 1, 2020, to October 12, 2020, accommodating all preparatory, installation, and testing phases.
Work Breakdown Structure (WBS)
The WBS decomposes the project into manageable components, fostering better oversight and cost control. The primary components include Site Preparation, Material Procurement, Installation, Wiring & Connections, Testing, and Troubleshooting (Bannerman, 2015). Each segment contains specific activities: for example, under Installation, tasks include panel installation, battery setup, wiring, and programming. Assigning unique codes and defining scope boundaries within the WBS enhances tracking and facilitates the integration of cost estimates within MS Project (PMI, 2017).
Cost Estimation Methodology
Cost estimates incorporate multiple elements: material costs, internal labor, and external contracting labor. Material costs are calculated based on quantities needed and unit prices—for example, each call box costing $1200, with one box per 0.25 acres of site area. Wiring harnesses, hardware kits, and other supplies are added with corresponding unit costs ($25, $20 respectively). Labor costs involve internal hours (200 hours at $100/hour) and external services for site preparation and installation, billed at rates of $200 and $150 per box, respectively.
Utilization of MS Project Formulas for Cost Calculations
To ensure accuracy and flexibility, formulas within MS Project are employed to automate cost calculations. For example, total material costs are derived by multiplying quantity required per task by unit costs, and then summed across all activities. Internal and external labor costs are computed by multiplying hours or tasks by respective hourly rates, with formulas updating dynamically when task durations or resource allocations change. This approach minimizes manual errors and ensures real-time updates to the project budget (Kerzner, 2013). The formulas also accommodate contingency estimates and indirect costs, providing a comprehensive financial overview.
Conclusion
Developing a detailed project schedule, coupled with a structured WBS and automated cost calculations in MS Project, equips project managers with the tools necessary for effective oversight and budget control of the Emergency Call Box Project 2020. The integration of these elements facilitates clarity, accountability, and adaptability, ensuring projects are completed on time and within budget. Future enhancements may include integrating risk management modules and resource leveling techniques to further optimize project delivery.
References
- Bannerman, G. (2015). Work Breakdown Structures for Project Management. Project Management Journal, 46(3), 43-56.
- Kerzner, H. (2013). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. Wiley.
- Project Management Institute (PMI). (2017). A Guide to the Project Management Body of Knowledge (PMBOK® Guide). PMI.
- Heldman, K. (2018). Project Management Professional (PMP) Certification All-In-One Exam Guide. Wiley.
- Lock, D. (2017). Project Management. Gower Publishing.
- Zwikael, O., & Smyrk, J. (2019). Project Management for the Unofficial Project Manager. Wiley.
- Meredith, J. R., & Mantel, S. J. (2017). Project Management: A Managerial Approach. Wiley.
- Chen, J., & Sharma, R. (2015). Cost Estimation and Budgeting in Infrastructure Projects. International Journal of Project Management, 33(4), 919-929.
- Atkinson, R. (2015). Project Cost Control and Management. Journal of Construction Engineering and Management, 141(7), 06015011.
- Bekker, M. M., et al. (2016). Effective Use of MS Project for Infrastructure Projects. International Journal of Managing Projects in Business, 9(2), 394-416.