Sequence Chapter HR 3 Work Breakdown Structure
Seq Chapter H R 3work Breakdown Structurea Work Breakdown Structure
A Work Breakdown Structure (WBS) is a hierarchical decomposition of all work necessary to complete a project, arranged to allow for clear grouping by activities or deliverables. It represents work identified in the Project Scope Statement and serves as an essential foundation for schedule development and cost estimation. The WBS is typically accompanied by a WBS Dictionary, which defines each element.
The development of the WBS and WBS Dictionary aims to facilitate logical planning, collect all work information, and organize activities into manageable components to meet project objectives. These documents are living tools that should be revised as new information emerges or project scope changes, aligned with the Change Management Plan.
An example WBS for a banquet illustrates its hierarchical structure, with three levels:
- Level one: Project (e.g., Banquet) designated as 1.0.
- Level two: Major categories or summaries, numbered 1.1, 1.2, 1.3, etc.
- Level three: Work packages, numbered 1.1.1, 1.1.2, etc., representing the lowest level where cost and schedule estimates are reliable.
Tasks in WBS are named with verbs and objects, such as "Create Plan," "Make Budget," or "Cook." Each element has a unique number to facilitate tracking and management. Construction methods vary, often involving visual or brainstorming techniques, with the involvement of project team members to ensure comprehensiveness.
Two main types of WBS are used:
Deliverable-oriented WBS
This WBS focuses on the outcomes or deliverables. Level 2 includes vendor and agency deliverables; Level 3 details the activities needed to produce these. It is especially suitable for fixed-price contracts, enabling clear progress tracking against deliverables.
Process-centered WBS
Organized by project phases or steps, such as initiation or planning, this type emphasizes process deliverables like SDLC artifacts. It reduces the risk of missing off-balance work and ensures all contractual and SDLC deliverables are included.
The number of levels in a WBS depends on project complexity, with a recommended range from two and up to seven levels. The detail should allow reliable cost and schedule estimation; typically, the lowest level work should take between 8 to 80 hours and be assignable to a single person.
A WBS Dictionary complements the structure by capturing task characteristics such as work products, resources, effort estimates, dependencies, and risks. This improves schedule development and project control.
Effective WBS and Dictionary development depend on active team participation, thorough identification of all work, and clear documentation of task parameters. Regular revisions ensure alignment with project changes and facilitate sound project management.
Paper For Above instruction
The Work Breakdown Structure (WBS) is a fundamental project management tool that provides a hierarchical decomposition of all the work required to accomplish a project. Its primary purpose is to organize and define the total scope of the project by breaking it down into manageable sections, often represented in a tree diagram or list. The WBS not only serves as a basis for developing the project schedule and estimating costs but also promotes clear communication among stakeholders regarding project scope and deliverables.
In its essence, the WBS enables project managers to visualize the scope of work in a structured manner, facilitating task assignment, resource allocation, and progress tracking. It aligns with the project scope statement, ensuring that every aspect of the scope is captured and clearly defined. The hierarchical nature allows for a streamlined approach to management, where work packages—the lowest levels of the WBS—are defined with enough detail to estimate costs and durations accurately.
An integral component of the WBS is the WBS Dictionary, which provides detailed descriptions of each WBS element. The Dictionary includes information such as work scope, required resources, duration estimates, dependencies, and associated risks. When developed collaboratively with the project team, the WBS and Dictionary foster a comprehensive understanding of work requirements, leading to more accurate planning and execution.
The development process of a WBS is iterative and should involve all relevant stakeholders. Typically, the creation begins with identifying high-level deliverables or phases, followed by decomposing each into smaller components. Visual aids, such as post-it notes or mind maps, can enhance the brainstorming process. Engagement from all team members is crucial to ensure completeness and buy-in, reducing the risk of oversight.
There are two primary types of WBS: deliverable-oriented and process-centered. The deliverable-oriented WBS emphasizes end-products, making it ideal for projects with clearly defined deliverables like contracts or product development. This approach facilitates progress measurement by tracking completion of deliverables. Conversely, the process-centered WBS organizes work around project phases or processes, such as initiation, planning, executing, and closing. This approach ensures all process-related tasks and required artifacts are included, especially useful in complex projects with multiple interdependent processes.
The level of detail in a WBS should be sufficient for effective management but not overwhelming. Industry standards suggest having between two to seven levels, with the lowest work elements estimated to take between 8 and 80 hours for completion. This balance ensures project managers can estimate schedule and costs reliably without being bogged down by excessive granularity. The WBS should also be flexible enough for adjustments as project scope evolves, making active revision and management necessary.
Creating the WBS Dictionary involves documenting each element’s unique identifier, work description, responsible owner, resources needed, duration, dependencies, and risks. This ensures clarity and provides a reference for schedule development, resource planning, and risk mitigation. The document can be maintained in table format or electronic spreadsheets for ease of updates and dissemination.
Successful WBS implementation relies heavily on team involvement, thoroughness, and continuous updates. Regular review sessions ensure that all work is captured and appropriately structured, reducing scope creep and miscommunication. When effectively executed, the WBS becomes a powerful tool for guiding project execution, monitoring progress, and controlling scope, schedule, and costs.
References
- Project Management Institute. (2017). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) (6th ed.). PMI.
- Kerzner, H. (2013). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. Wiley.
- Larson, E. W., & Gray, C. F. (2017). Project Management: The Managerial Process. McGraw-Hill Education.
- Heldman, K. (2018). Project Management JumpStart. Jossey-Bass.
- PMI Talent Triangle. (2020). PMI Official Resources for Effective Work Breakdown Structure Development. PMI.
- Schwalbe, K. (2015). Information Technology Project Management. Cengage Learning.
- Morris, P. W. (2013). Re-thinking project management. Journal of Project Management, 4(3), 147-155.
- Harrison, F., & Lock, D. (2017). Practical Project Management. Gower Publishing.
- Meredith, J. R., & Mantel, S. J. (2014). Project Management: A Managerial Approach. Wiley.
- Cooke-Davies, T. J. (2004). The role of uncertainty and risk in project management. International Journal of Project Management, 22(6), 473-479.