These Numbers And Times Are Examples To Give You An Idea ✓ Solved

These numbers and times are examples to give you an idea, you

You are a newly hired IT employee for XYZ Company. As part of your role, you are responsible for deployment of the organization's 100 workstations. The current break-down of computers includes 75 desktops and 25 laptops. All of the workstations are 5+ years old, and management has decided that it is time to replace the old hardware and upgrade from Windows XP.

Historically, IT staff at XYZ have used the CDs that come with the workstations to install the Operating System. You think this method is outdated and that there is a better solution. Management has asked you to develop a deployment plan which details an alternative solution and justifies a change in procedure. Your task is to do the following:

1. Decide which Operating System edition and version to install on the new machines. What factors make it the best choice?

2. Research deployment tools and choose one for distributing the operating systems and any common applications to the new hardware. What deployment software or systems would you purchase to do this? What are the benefits? What are the downsides? Why are you selecting this tool or method? Why is it a good fit for this organization?

3. Document the entire process for removing the old hardware, installing the new operating system, distributing the new hardware, and system setup. Your process plan should include everything IT, management, and the users need to do to get them from doing their job on their old XP machines to being productive on their new systems. The plan should include what you will do with the old equipment. Will there be training involved? If so, when in the process will this take place? How are you ensuring that although all the machines appear similar to an end user, they are unique on the network/domain?

4. Create a timeline for the project. Include a breakdown of how long each step of your process would take per workstation. Include an overall timeline breaking down when each part of the work will take place. Consider how the changeover will affect both ongoing IT operations and user downtime.

5. Prepare a cost analysis for your plan. Include the costs for any software you recommend. Include the costs for all of the labor required. Use fixed hardware costs of $1000/desktop and $1500/laptop. Compare the costs for your plan to the costs of performing individual manual installs on each machine.

6. Formatting - Clarity, cleanliness, and professionalism of presentation.

7. Organization - Logical structure and flow. Be sure to include an introduction and your conclusions.

8. Grammar - Clarity, correctness, and professionalism of language.

9. Other considerations - How deeply and creatively did you think about the project?

Paper For Above Instructions

The deployment of new workstations within an organization requires a methodical approach to ensure minimal disruption and maximum efficiency. The transition from outdated systems can greatly influence employee productivity and satisfaction. This paper will outline a comprehensive deployment plan for XYZ Company, involving the selection of a suitable operating system, deployment tools, a systematic removal and installation process, a project timeline, and a cost analysis.

Operating System Selection

The selection of an operating system is foundational for the successful deployment of new workstations. After careful consideration, I recommend installing Windows 10 Professional on all new machines. Windows 10 offers enhanced security features, better user interface, and broader software compatibility than Windows XP or even earlier versions of Windows. Specific advantages include Built-in Windows Defender for real-time protection, better compliance with modern software requirements, and a familiar interface that could reduce the learning curve for users transitioning from Windows XP. Furthermore, Windows 10 provides regular security updates and patches which are essential for maintaining the security posture of the organization.

Deployment Tools

For deploying the operating system and applications efficiently, I recommend using Microsoft Deployment Toolkit (MDT). MDT is a free tool that allows for comprehensive deployment, including operating systems, applications, and settings. The benefits of MDT include its ability to streamline and automate deployment, minimizing human error and labor costs while maximizing efficiency. However, one downside is the initial time investment in learning and setting up the toolkit, which may be a barrier for some IT staff. Since XYZ Company aims for a long-term solution, MDT is a fitting choice due to its robust functionality and proven track record in enterprise environments.

Process Documentation

The deployment plan will consist of several major phases:

  • Removal of Old Hardware: Technicians will inventory and remove the existing desktops and laptops, ensuring all data is backed up securely in the process. All data migration will be completed within 15 minutes per workstation, totaling approximately 25 hours.
  • Installation of the New Operating System: New workstations will have Windows 10 installed via MDT. This process is projected to take 1 hour per machine, adding approximately 100 hours.
  • Distribution of New Hardware: Once configured, new machines will be distributed to users, with IT support on hand to provide assistance. This process is estimated to take about 30 minutes per workstation, totaling 50 hours.
  • Training: Training sessions will be organized for users to introduce them to Windows 10 features. These sessions will last about 2 hours per group and will occur after the installation of the new operating systems.
  • Unique Network Configuration: To ensure that no conflicts arise on the network, each workstation will be assigned unique identifiers upon deployment, including hostname and MAC address configuration, which will include a thorough checklist for verification.

Project Timeline

The entire project is estimated to span over three weeks, with the following timeline:

  • Week 1: Removal of hardware from 10 workstations nightly.
  • Week 2: Installation of Windows 10 on 10 workstations each night.
  • Week 3: Distribution and training for 50 users a week.

The aim is to have all system upgrades completed at the end of the third week, ensuring that IT operations are maintained and users experience minimal downtime throughout the process.

Cost Analysis

The anticipated costs for this deployment plan are as follows:

  • Hardware costs: 75 desktops x $1000 = $75,000
  • Hardware costs: 25 laptops x $1500 = $37,500
  • Software reduction through MDT implementation = $0 (Free tool)
  • Labor costs for the entire deployment (estimated at 140 hours at $25/hour) = $3,500

Total cost for the deployment plan is approximately $116,000. The traditional manual installation of each machine, estimated to take 5 hours per workstation, would have totaled about $118,500, thus providing a savings of $2,500 with structured deployment.

Conclusion

The deployment of new workstations at XYZ Company is a pivotal step toward modernizing their infrastructure and enhancing operational efficiency. By opting for Windows 10 Professional, utilizing MDT for deployment, and structuring a detailed rollout plan, XYZ will not only improve productivity but will also position themselves better to meet future IT challenges.

References

  • Microsoft. (2023). Windows 10: Features and Benefits. Retrieved from https://www.microsoft.com/windows
  • TechRepublic. (2023). Why you should be using Microsoft Deployment Toolkit. Retrieved from https://www.techrepublic.com
  • Gartner. (2023). Best Practices for IT Deployment Solutions. Retrieved from https://www.gartner.com
  • Forrester. (2023). Understanding the Costs of Workstation Deployment. Retrieved from https://go.forrester.com
  • PCMag. (2023). The Best Windows 10 Features for Business Users. Retrieved from https://www.pcmag.com
  • TechTarget. (2023). Effective IT asset management strategies. Retrieved from https://www.techtarget.com
  • Computerworld. (2023). The case for automated OS deployment. Retrieved from https://www.computerworld.com
  • ZDNet. (2023). Windows 10 vs. Windows XP: What's the difference? Retrieved from https://www.zdnet.com
  • Uptime Institute. (2023). Hardware Lifecycle Management. Retrieved from https://uptimeinstitute.com
  • CIO Magazine. (2023). The future of IT - What to expect in workstation management. Retrieved from https://www.cio.com